Winter 2011 Handout - Installing and Configuring Icinga to Monitor the Arm Build Farm
Contents
Status
This page status is: DRAFT.
Title
Installing and Configuring the Icinga monitoring software to Monitor the Arm Build Farm in CDOT.
Participants
Gian-Luca Casella (IRC:gcasella) -- Semester 6 CTYC Student at Seneca College.