Difference between revisions of "User:Tpcheun1"

From CDOT Wiki
Jump to: navigation, search
(Week 9 - Mar 28)
(Week 8 - Mar 21)
Line 55: Line 55:
 
== Week 8 - Mar 21  ==
 
== Week 8 - Mar 21  ==
 
<font color=green>Plan
 
<font color=green>Plan
* Learn nexj server's deployment and configuration
+
* Draw UML
* Learn scheme
 
 
</font>
 
</font>
  

Revision as of 10:36, 17 February 2011

My name is Tung Pui Cheung

Studying in Bachelor of Software Development at Seneca College, semester four

Also, working in Seneca open source research center at part-time

IRC nick: tung

email: tpcheun1@sene.....

My visual notes

Homemade wallpaper


Week 1 - Jan 31

  • Install softwares on the PC and set up window7.
  • Learn two tutorials "Introduction To NexJ Studio Express" and "Working with NexJ Express Source Code" pdf

Week 2 - Feb 7

  • Install Nexj softwares on my laptop
  • Continuous learning "Introduction To NexJ Studio Express" pdf
  • Take some screen shots for the tutorials

Week 3 - Feb 14

  • Continuous learning "Introduction To NexJ Studio Express" pdf
  • Take more screen shots for the tutorials

Week 4 - Feb 21

Plan

  • Learn nexj server's deployment and configuration
  • Learn scheme

Week 5 - Feb 28

Plan

  • Learn GWT and Json

Week 6 - Mar 7

Plan

  • Learn GWT and CSS
  • Develop prototype

Week 7 - Mar 14

Plan

  • Learn nexj server's deployment and configuration
  • Learn scheme

Week 8 - Mar 21

Plan

  • Draw UML

Week 9 - Mar 28

Plan

  • Design, Coding and Testing

Week 10 - Apr 4

Plan

  • Design, Coding and Testing

Week 11 - Apr 11

Plan

  • Design, Coding and Testing

Week 12 - Apr 18

Plan

  • Put lipstick on the page