Difference between revisions of "User:Gbatumbya/tasklist/2010May"

From CDOT Wiki
Jump to: navigation, search
(12 Wednesday)
(12 Wednesday)
Line 34: Line 34:
 
=='''12 Wednesday'''==
 
=='''12 Wednesday'''==
 
* Continued with NexJ tutorials up to section 10
 
* Continued with NexJ tutorials up to section 10
 +
 +
=='''13 Thursday'''==
 +
* Continued with NexJ tutorials up to section 14
 +
 +
=='''14 Friday'''==
 +
* Finished NexJ tutorials
 +
* Preparing for OCE, reading about NexJ health suite [http://www.nexj.com/health-products] and Open EHR [http://www.openehr.org]

Revision as of 10:31, 14 May 2010

04 Tuesday

  • Setup IRC
  • Setup WikiPage
  • Install dual boot Windows 7 and Fedora 12
  • Install NexJ Studio Express
  • Install eclipse environment

05 Wednesday

  • Finish with setting up NexJ Studio Express
  • Start Tutorial for using NexJ Studio
  • Continue Setting up Eclipse environment
  • Start blog: gbatumbya.wordpress.com

06 Thursday

  • Finished Eclipse environment setup
  • Setup Visual Studio
  • Started studying about Eclipse Modeling

07 Friday

  • NexJ Studio Express Tutorial
  • Studying about EMF

10 Monday

  • Met with Jordan, for now get NexJ up and running
  • Back to working with NexJ Studio Express Tutorial
  • In touch with contact person at NexJ, Greg Fenton
  • Waiting on NexJ to send me updated version of Studio
  • Setup IRC in Eclipse
  • Studying about EMF

11 Tuesday

  • No need for updated version of NexJ Studio, Greg helped me to overcome the problem
  • Continued with NexJ tutorials up to section 4

12 Wednesday

  • Continued with NexJ tutorials up to section 10

13 Thursday

  • Continued with NexJ tutorials up to section 14

14 Friday

  • Finished NexJ tutorials
  • Preparing for OCE, reading about NexJ health suite [1] and Open EHR [2]