Difference between revisions of "Team T - OOP344 20133"

From CDOT Wiki
Jump to: navigation, search
(0.3)
(Project Marking Percentage)
Line 2: Line 2:
 
== Project Marking Percentage ==
 
== Project Marking Percentage ==
 
* due right after study break
 
* due right after study break
<big><syntaxhighlight lang="cpp">Group work: XX% (25 <= xx <= 50)
+
<big><syntaxhighlight lang="cpp">Group work: 50% (25 <= xx <= 50)
Individual work: XX% + (50 <= xx <= 75)
+
Individual work: 50%  
 
-------------------------
 
-------------------------
 
Total 100%
 
Total 100%

Revision as of 23:39, 30 October 2013

Team Name (Team T)

Project Marking Percentage

  • due right after study break
Group work: 50% (25 <= xx <= 50)
Individual work: 50% 
-------------------------
Total 100%

Repository

Master Branch Status

Status

  • Open/Closed
    Open: you can merge now.
    Closed: Wait for the repo to get opened

Logs

  • DateTime, Merged/being Merged by full name, ircnick: mynick, any other info

Coding Style and Standards

  • No Tab Character allowed. (replace tabs with spaces)
  • Each object must have its own type:
int a;
int b;
CDialog D;


Team Members

Team Name : Team T
First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Jingwei Sun C jsun72 Jingwei Sun John_Titor ParBlog
Shao Hua Liu C shliu2 Shao Hua Liu Catshl Shao's Blog
Wei Xia C wxia11 Wei Xia wei111 Wei's Blog
Yatao Sun A ysun101 Yatao Sun tom10 Tom's OOP344 Blog

tasks

task name

  • task description
  • being done by team member name / not assigned
  • status
====0.3====
  • prototyping

--Shaohua Liu
--status:Done

-- Revised by :

  • CLabel

--Yatao Sun
--status:
--Revised by :

  • CDialog

--Luke Jingwei Sun, Wei Xia
--status:
--Revised by:


  • CLineEdit

-- Shaohua Liu
--status:
--Revised by :

meetings

  • 2013 10/19

topic, date

date

  • Date: 2013 10/19 Topic: How to use git and allocate the workload