Difference between revisions of "Team T - OOP344 20133"

From CDOT Wiki
Jump to: navigation, search
(task name)
(task name)
Line 56: Line 56:
 
* being done by team member name / not assigned
 
* being done by team member name / not assigned
 
* status
 
* status
++++++++++++++++++++++++++++++++++++++++++++++++++*
+
============0.3===============
 
*'''prototyping'''
 
*'''prototyping'''
 
--            <br/>
 
--            <br/>
 
--status:
 
--status:
 +
  
 
*'''CLabel'''
 
*'''CLabel'''
 
--            <br/>
 
--            <br/>
 
--status:
 
--status:
 +
  
 
*'''CDialog'''
 
*'''CDialog'''

Revision as of 14:49, 19 October 2013

Team Name (Team T)

Project Marking Percentage

  • due right after study break
Group work: XX% (25 <= xx <= 50)
Individual work: XX% + (50 <= xx <= 75)
-------------------------
Total 100%

Repository

Master Branch Status

Status

  • Open/Closed
    Open: you can merge now.
    Closed: Wait for the repo to get opened

Logs

  • DateTime, Merged/being Merged by full name, ircnick: mynick, any other info

Coding Style and Standards

  • No Tab Character allowed. (replace tabs with spaces)
  • Each object must have its own type:
int a;
int b;
CDialog D;


Team Members

Team Name : Team T
First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Jingwei Sun C jsun72 Jingwei Sun John_Titor ParBlog
Shao Hua Liu C shliu2 Shao Hua Liu Catshl Shao's Blog
Wei Xia C wxia11 Wei Xia wei111 Wei's Blog
Yatao Sun A ysun101 Yatao Sun tom10 Tom's OOP344 Blog

tasks

task name

  • task description
  • being done by team member name / not assigned
  • status
======0.3=========
  • prototyping

--
--status:


  • CLabel

--
--status:


  • CDialog

--
--status:


  • CLineEdit

--
--status:

meetings

  • 2013 10/19

topic, date

date

  • 2013 10/19 Topic: How to use git and allocate the workload