Difference between revisions of "Team KaRouSeL - OOP344 20112"

From CDOT Wiki
Jump to: navigation, search
(updated Repository)
(Project Marking Percentage)
 
Line 5: Line 5:
 
* due right after study break
 
* due right after study break
 
<big>
 
<big>
  Group work:      XX%        (25 <= xx <= 50)
+
  Group work:      50%        (25 <= xx <= 50)
  Individual work: XX% +      (50 <= xx <= 75)  
+
  Individual work: 50% +      (50 <= xx <= 75)  
 
  -------------------------
 
  -------------------------
 
  Total          100%
 
  Total          100%

Latest revision as of 02:17, 21 August 2011


OOP344 | Weekly Schedule | Student List | Teams | Project | Student Resources

Team KaRouSeL

Project Marking Percentage

  • due right after study break

Group work:      50%        (25 <= xx <= 50)
Individual work: 50% +      (50 <= xx <= 75) 
-------------------------
Total           100%

Repository

Team Members

First Name Last Name Section Seneca Id wiki id IRC nick Blog URL
Romero C. A. Silva OOP344A rcostaalvesdasilva Rcasilva rcasilva Rcasilva's OOP344 blog
Luigi Bozianu OOP344A lbozianu Lbozianu luigibozi Bozi's blog
Sho Abe OOP344A sabe Sabe shoabe Sho's blog

Tasks

Task Name

  • task description
  • being done by team member name / not assigned
  • status


Meetings

  • latest will be on top

Topic, Date

date