Synology Rackstation
==X-Gene Blue (replacing Red)==
* Firmware: apm 3.06.25
* OS: 4.1415.186-300.fc27.aarch64
* Storage: 500 GB SSD
* RAM: 8GB
* Serial: 1
===Upgrades:===- * Increase RAM to 16 GB
===Services to Install/Setup:==={| class="wikitable sortable" width="50%" border="1" cellpadding="3" cellspacing="0"!Service!!Critical!!EHL Internal!!CDOT Network!!Internet!!Status|-|Gateway||*||✓||✓||✓||Complete
|-
|DHCP||*||✓||✓||||Complete
|-
|DNS||*||✓||✓||✓||Complete
|-
|Firewall/Routing/NAT||*||✓||✓||✓||Complete
|-
|PXE OS Install||*||✓||✓||||Complete
|-
|VPN|| ||✓||✓||✓||
|-
|Ansible|| ||✓|| || ||
|-
|CDOT Wiki|| || ||✓|| ||
|-
|LEAPLEAPproject.ca|| || || ||✓||
|-
|Pidora Website.ca|| || || || ✓||
|-
|Serial/PDU control||*||✓|| ||||Complete
|-
|Fedora/CentOS Mirror Services|| ||✓||✓|| ||
|}
 
==Synology Rackstation==
 
* Physical Storage: 1 TB SSD x12
* RAM: 24 GB
 
===Storage Configuration===
{| class="wikitable sortable" border="1" cellpadding="3" cellspacing="0"
!Volume!!RAID Level!!Allocated Drives!!Total Space
|-
|System OS||1||1,2||934 GB
|-
|Leap and Pidora||6||3-12||2.4 TB
|-
|Backups||6||3-12||4.9 TB
|}
 
===Upgrades===
* Change storage setup and allocation (RAID 6) - <span style="color:#00FF00">'''Complete'''</span>
 
===Services to Install/Setup===
{| class="wikitable sortable" border="1" cellpadding="3" cellspacing="0"
!Service!!Critical!!EHL Internal!!CDOT Network!!Internet
|-
|Backup NAS||*||✓||✓||
|-
|Fedora 27 x86_64 Mirror|| || ||✓||
|-
|Fedora 27 Aarch64 Mirror||*||✓|| ||
|-
|CentOS 7 x86_64 Mirror|| || ||✓||
|-
|CentOS 7 Aarch64 Mirror|| ||✓|| ||
|}
'''Note:''' Mirror refers to data storage and will act as a NAS target via ''Blue''.
 
==Cyclades Terminal Server==
 
* Firmware: 2.6.11
 
===Upgrades===
 
* Firmware update to 3.0.0-1
 
==APC UPS - Cabinet 1, Upper Device==
 
===Repairs===
* Battery pack dead, needs replacement
 
==General Maintenance==
* EHL cabinet fans must be cleaned
* X-Genes should be reallocated between both cabinets for better power consumption/heat dissipation
* Improved cable labelling
* Power fail-over testing