Difference between revisions of "BTP300 Team RAAP"

From CDOT Wiki
Jump to: navigation, search
(Trunk Status)
(Project Status)
Line 22: Line 22:
  
 
Divided Assignment 2 among team members: Oct 12, 2011
 
Divided Assignment 2 among team members: Oct 12, 2011
 +
 +
Worked on CFrame, drawing the box and capturing the characters the box covers : Renaldo H
  
 
== Resources ==
 
== Resources ==

Revision as of 23:36, 20 October 2011


BTP300 Fall 2011 | Weekly Schedule | Student List | Project Requirements | Teams and their Projects | Student Resources

RAAP

Repository

SVN Repository link: svn://zenit.senecac.on.ca//btp300_113rep7

Repo ID

btp300_113rep7

Trunk Status

Added Assignment 1 to trunk folder: committed by Archana

Team Members

  1. Renaldo
  2. Archana Sahota
  3. Ari Azar
  4. Pradeep Waragoda

Email All

Project Status

Started Assignment 2: Oct 12, 2011

Divided Assignment 2 among team members: Oct 12, 2011

Worked on CFrame, drawing the box and capturing the characters the box covers : Renaldo H

Resources