Open main menu

CDOT Wiki β

Changes

BTP300B Team 3 Weekly Log

816 bytes added, 20:36, 4 November 2012
Week 8
==Week 6 ==
*15/10/15/2012: Assigned function roles:<br> *:Alex: CLabel<br> *:Wesley: CButton<br> *:Joe: C_____CLine<br> *:Daniel: C_____CField<br>Setup and recieved SVN Instructions:*Use this link to get info on SVN http://zenit.senecac.on.ca/wiki/index.php/Using_the_SVN_Tool_for_A2*This link will allow you to get a copy of the SVN client http://tortoisesvn.net/downloads.html*:/trunk contains the original code, do not mess with this*:/branches contains our separate file folders, each contains our own work*:/tags contains snapshots whenever we merge the code
==Week 7 ==
*24/10/2012: It's been study week for a couple days now, working on setting up everyone on SVN and hopefully get a decent amount of work done by the end of the week
 
==Week 8 ==
*04/11/2012: We've finished a basic draft of each class and are in the debugging phase. Daniel has started working on CDialog while we have begun debugging. Once the debugging is complete/ if we need another working on CDialog sooner, we will adjust.
 
==Week 9 ==
==Week 10 ==