Difference between revisions of "BTP300A Team 42 A2 Weekly Log"

From CDOT Wiki
Jump to: navigation, search
Line 14: Line 14:
  
 
==Week 5==
 
==Week 5==
*10/05 (Thursday) Pair Programming over Skype
+
*10/04 (Thursday) Pair Programming over Skype
 
**Methods were evenly split
 
**Methods were evenly split
 
 
**Added cross-platform functionality: hide cursor during frame movement  
 
**Added cross-platform functionality: hide cursor during frame movement  
 +
*10/05 (Friday) Pair Programming in the Computer Lab
 +
**Minimal requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission
 +
**Started working on optimization (besides the cursor hiding)
  
 
+
*10/06 (Saturday) Assignment 2 Release 0.1 is submitted
 
*10/07 (Sunday) Assignment 2 Release 0.1 is Due
 
*10/07 (Sunday) Assignment 2 Release 0.1 is Due
  

Revision as of 00:29, 5 October 2012

BTP300 Links

Contributions

Week 5

  • 10/04 (Thursday) Pair Programming over Skype
    • Methods were evenly split
    • Added cross-platform functionality: hide cursor during frame movement
  • 10/05 (Friday) Pair Programming in the Computer Lab
    • Minimal requirements are met, all tests are completed; Assignment 2 Release 0.1 is ready for submission
    • Started working on optimization (besides the cursor hiding)
  • 10/06 (Saturday) Assignment 2 Release 0.1 is submitted
  • 10/07 (Sunday) Assignment 2 Release 0.1 is Due

Week 6

Week 7

  • 10/21 (Sunday) Assignment 2 Release 0.2 is Due

Study Week

  • 10/28 (Sunday) Assignment 2 Release 0.3 is Due