Difference between revisions of "User:Chris Tyler/HWD101 Scratchpad"

From CDOT Wiki
Jump to: navigation, search
(Topic Outline)
(Topic Outline)
Line 40: Line 40:
 
*** Internal power connectors
 
*** Internal power connectors
 
*** Power supplies
 
*** Power supplies
 +
*** Memory modules
 +
*** CPU modules
 +
*** PCIe cards
 +
*** SATA and SAS connectors
 
** 19" Rackmount
 
** 19" Rackmount
 
*** Rack types
 
*** Rack types
Line 76: Line 80:
 
** Conversions (binary, decimal, octal, hexadecimal)
 
** Conversions (binary, decimal, octal, hexadecimal)
 
* Data centre operations
 
* Data centre operations
 +
** Server Assembly
 +
*** Build a 1u server with appropriate memory, airflow, storage, and cable placement
 
** Building a rack
 
** Building a rack
 
*** Installing devices
 
*** Installing devices

Revision as of 00:07, 24 September 2014

Important.png
This is a draft only!
It is still under construction and content may change. Do not rely on this information.

Topic Outline

  • Major components of a digital computer system
    • CPU
    • Memory
    • Storage
    • Network connections
    • I/O busses
  • Major Architectural Families
    • x86 (x86_32, x86_64,x64)
    • ARM (arm, aarch32, aarch64)
    • SPARC
    • POWER
    • MIPS
    • Z9
  • Electrical Power
    • How electrical energy is used in a computer system
    • The relationship between energy consumption and heat
    • AC vs. DC Power
    • Electrical measurement: voltage, current, wattage
    • AC Power
      • Wattage vs. VA
      • 110, 207, 220, and other voltage standards
      • 1-phase and 3-phase electrical supplies
      • AC power connectors
      • Power Conversion Factors, harmonics, and spikes
      • Surge suppression
    • DC Power
      • Common DC power busses
      • Storing and distributing DC power
    • Uninterruptable power supplies
  • Cooling
    • Working temperatures
    • Airflow
    • Hot zone/cold zone
  • Physical standards
    • PCs
      • Mainboard form factors (ATX, ITX, ...)
      • Internal power connectors
      • Power supplies
      • Memory modules
      • CPU modules
      • PCIe cards
      • SATA and SAS connectors
    • 19" Rackmount
      • Rack types
      • Mounting systems
      • "u" height designations
    • 23" OCP
      • Rack types
      • Sleds
      • Disaggregation
  • Storage
    • Hard Drives
    • SSDs
    • Flash memory
    • Other storage devices
  • Cabling
    • Power
      • AC connector types
      • Cable restrictions
    • Networking - Copper
      • Cable types (Cat4/Cat5/Cat5e/Cat6/twinax)
      • Connector types (e.g. RJ45, SFP+ DA)
      • Cable restrictions (e.g., minimum bend radius)
      • Cable type tradeoffs (power, latency, cost, distance, ...)
    • Networking - Fiber
      • Cable types
      • Connector types
      • Cable restrictions (e.g., minimum bend radius, temperature, ...)
      • Cable type tradeoffs (power, latency, cost, distance, ...)
    • Network Error Rate Testing
      • Line quality, reflectometer, BERT and BLERT testing
  • Digital data
    • Binary states
    • Numbering systems
    • Coding systems (floating point, characters)
    • Units (byte, kb, mb, gb, pb, eb; kib, mib, gib, pib, eib)
    • Conversions (binary, decimal, octal, hexadecimal)
  • Data centre operations
    • Server Assembly
      • Build a 1u server with appropriate memory, airflow, storage, and cable placement
    • Building a rack
      • Installing devices
        • Installing into a rack using rack ears
        • Installing into a rack using rails
        • Using a Server Lift
      • Cabling for power
        • Installing a PDU
        • Cabling a PDU
      • Cabling for data
        • Installing a patch panel
        • Cat6 Cabling
        • Cable dressing
      • Asset registration and tracking
        • MAC and Serial number registration

Learning Objectives

Lab Equipment

Per group:

  1. An open-frame 19" rack with casters (< ~$550)
  2. Finger channels
  3. Rackmount server case(s) with ATX or ITX motherboards
  4. Fibre NICs or SFP+ adapters
  5. Fibre cables
  6. SFP+ cables
  7. Network switch
  8. Two PDUs (ideally, at least one should be intelligent)
  9. Cagenuts
  10. Basic tools
  11. Cables (do/should students make their own?)
  12. Barcode scanner (< $50)

Per lab room:

  1. Ceiling channels?
  2. Power
  3. Rackmount platform lifter